Back to the Bathroom!

When we started our master bathroom renovation, the big goal was to have it completed by the time we went on our trip, since Nik would be going to back to teaching soon after returning. Well, we didn’t quite make the deadline but we’re back at it in earnest, so I’m hoping within the next few weekends this project really starts to wrap itself up.

When we left for vacation, we were in the middle of the frustrating cement board installation on the shower walls:

IMG_3741

It was going very slowly, and we were really struggling to get the cement board to break in the right places – it can’t really be “cut”, so you’re supposed to “easily score and snap it”, according to the website. But, it’s 1/2″ thick cement fiber board, and unfortunately, neither of us is the Hulk.

But this past Saturday, refreshed and renewed, we got back at it, and began using a revised method of breaking the 1/2″ thick concrete boards by raising the desired part up off the ground on some 2×4’s, with the part we were planning to break off in the air, and then stomping on the break point that we scored with a blade. This worked about 90% of the time, and we were even able to use a modification of this method to bust out a circle using some scoring and a hammer to  go around the shower faucet.

IMG_3914

IMG_3916

IMG_3917

I think the big difference was moving the boards outside…where I wasn’t worried about what was under them. Previously, we’d been attempting to do this in the bathroom, over the newly tiled floor, so I think we were being overly delicate. Anyways…

We got the boards mounted and screwed reasonably well into the studs with the alkali resistant Hardi screws. A few of the screws crumbled edges of the board, but nothing bad enough to not move forward. Seeing all the pieces in place after finishing (and no more studs to be seen!) was such a refreshing sight! It made me feel like a legitimate contractor (if I ignored the fact that this single part of the project took us about a month and a half to do). So that was Saturday.

On Sunday, we ran some errands in the morning and ended up at Home Goods looking at mirrors. Nik has been worried about reinstalling our old huge mirror because he felt it would be hard to mount safely, plus building a nice frame around it would take time and I think we’re both about ready to be through with this project. We found some nice sized simple mirrors for $80 each, so we bought two to mount side by side. When I saw how excited Nik was at this purchase, I felt bad that I haven’t been giving him more breaks like this! We also got the sink backsplash affixed to the wall, and I sealed the doors with polycrylic. To fully wrap up the sink area, we need to mount the mirrors, caulk around the backsplash, install the doors and attach the pulls, and line the cabinets with new liners, most of which are easy jobs that we can get done this weekend:

IMG_3922

Later on Sunday, Nik got to work on some of his lesson planning for teaching, and I got to work mixing up a small batch of mortar to patch the shower seams. This involved smearing mortar on the seam, embedding a a 2″ strip of alkali resistant tape, and smoothing it over. I can’t remember if I mentioned our shower niche, but it’s that black thing:

IMG_3920

Close-up of the tape:

IMG_3921

IMG_3919

Now that this is done and dry, the next step will be waterproofing everything by rolling on 1-2 coats of red guard membrane, which we may begin to tackle tonight. The next step is mortar and tile, which I can’t wait for!

Comments

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s