The Tile is Up!

We didn’t get to grouting last weekend, but we DID get all of the tile on the wall! Tiling around the nook was not fun, and didn’t come out perfect, but I’m hopeful that the grout will patch in all the cracks and it will look great when it’s done!

Last weekend we got the tiles on the back of the nook done irst, so we could get a decent measurement on the depth of the side tiles. This weekend we first did the tiles lining the walls of the nook, which went alright. We laid them out first to make sure our measurements worked:


It was tricky, because I didn’t account for the fact that all the walls of the nook are slanted to allow water to flow out instead of collect inside, so the corners all have a pretty tight fit towards the back of the nook, but quite a wide gap at the front of the nook. But I think with the grout in, this will look normal.




On Sunday, we then cut the tiles for the wall around the nook, got our last row of mosaic tiles down, and finished with the bullnose on the edges of the tile. The 45 degree mitered corners of the bullnose tiles for each corner of the side walls just about had me in tears. Something just wasn’t measuring right, and we ended up wasting a few of these expensive tiles, and I had to drive back to Lowe’s to buy 3 more. But it’s done, and we’re so relieved. I even vacuumed up and neatened around the pan, so you can actually see our floor!



Next weekend will be grout grout grout, and hopefully tackling smoothing over the seam between tile, cement board, and drywall so we can paint around the shower. AND Sunday is our one year anniversary! Hard to believe it’s been a year already, but I guess that’s a good thing. We have an exciting event planned for Saturday, so we’ll update with some pictures next week if it goes well =)

I’ll leave you with a picture of our huge resident praying mantis. We see it every few days, and this thing is a beast. Shortly after I took this picture, it caught a large bumble bee and munched (crunched? There was lots of crunching…) it ALIVE right in front of us. At one point he dropped the injured bee onto the ground, and eerily walked all the way off the plant to the ground to retrieve the poor bee so he could finish his feast. Usually Nik is politely tolerant of  my often excessive interest in nature and bugs, and will briefly come look at the weird things I find. But for this show he was even engrossed!



Progress Here and There

This weekend Nik got 3 applications sent away, so we had some time to get more work done on the shower. The tile is almost done (being placed, that is. Grouting hasn’t begun yet)! The last step of tile-laying is around the niche, and it will be complicated – having these tiles meet at right angles is tricky, because it’s not just tile measurements as it’s been everywhere else. Around the niche, we also have to account for the thickness of mortar and tile on the tiles in the niche and around the niche to ensure they meet at the right place. Cutting as we go might be necessary for this section.

Here is our progress after this weekend:


It was hard to get the whole shower in one picture…sorry for the bad angle. I also did just the inside of the niche, with the accent tiles, so we at least would know the thickness to build off of for the sides, top and bottom:


We got a couple other projects underway or completed this weekend which felt good. We bought an old window frame upwards of 2.5 years ago from an old warehouse in Durham, with plans to make a collage picture frame. We first reglazed the panes (this actually happened so long ago, it was before we bought out house!). Then, trying to figure out how to attach the prints to the inside of the glass derailed this project for about 2 years – we thought of using little black picture corner attachers, but the adhesive side that would show against the glass wasn’t pretty. Then we tried directly gluing pictures, but the glue made marks on the photos.

We had about given up, so we looked up videos of how other people successfully mounted pictures into these DIY window frames. This lady with a thick southern drawl came on, and said ‘it’s so quick and easy you wouldn’t believe it’ (hah, we thought, there’s NO way, we’ve been thinking about this for years and everything we try looks ugly and noticeable). She instructed us to use invisible tape – yup, plain tape, and just tape the corners. We were unimpressed, and knew we would see the tape and it would look so amateur. But in our desperation to get this project done, I tried it.

And guess what? YOU COULDN’T SEE THE TAPE! So, 2.5 years later, and we finally finished this project, using pictures from before our wedding, our honeymoon, and our trip to Utah. Now we just need to find a place to hang it!



I know this picture is blurry…but you can’t see the tape!!

There was one more project we did this weekend building a piece of furniture from scratch as a surprise for Nik’s best man’s new baby. I’ll wait a couple weeks until after we’ve given it to him to post that, in case they stumble on the blog in the meantime. I just wanted to mention it, you know, in case you thought we weren’t very productive this weekend!

I’m really hoping to get the rest of the tile in Saturday, so we can at least think about grouting on Sunday. After that, we need to patch all the drywall around the tile and finish painting the walls, caulk around the shower pan and finish installing the drain, and then finally install the doors and faucet hardware. I swear, this list seems to never get shorter…

Back to the Bathroom!

When we started our master bathroom renovation, the big goal was to have it completed by the time we went on our trip, since Nik would be going to back to teaching soon after returning. Well, we didn’t quite make the deadline but we’re back at it in earnest, so I’m hoping within the next few weekends this project really starts to wrap itself up.

When we left for vacation, we were in the middle of the frustrating cement board installation on the shower walls:


It was going very slowly, and we were really struggling to get the cement board to break in the right places – it can’t really be “cut”, so you’re supposed to “easily score and snap it”, according to the website. But, it’s 1/2″ thick cement fiber board, and unfortunately, neither of us is the Hulk.

But this past Saturday, refreshed and renewed, we got back at it, and began using a revised method of breaking the 1/2″ thick concrete boards by raising the desired part up off the ground on some 2×4’s, with the part we were planning to break off in the air, and then stomping on the break point that we scored with a blade. This worked about 90% of the time, and we were even able to use a modification of this method to bust out a circle using some scoring and a hammer to  go around the shower faucet.




I think the big difference was moving the boards outside…where I wasn’t worried about what was under them. Previously, we’d been attempting to do this in the bathroom, over the newly tiled floor, so I think we were being overly delicate. Anyways…

We got the boards mounted and screwed reasonably well into the studs with the alkali resistant Hardi screws. A few of the screws crumbled edges of the board, but nothing bad enough to not move forward. Seeing all the pieces in place after finishing (and no more studs to be seen!) was such a refreshing sight! It made me feel like a legitimate contractor (if I ignored the fact that this single part of the project took us about a month and a half to do). So that was Saturday.

On Sunday, we ran some errands in the morning and ended up at Home Goods looking at mirrors. Nik has been worried about reinstalling our old huge mirror because he felt it would be hard to mount safely, plus building a nice frame around it would take time and I think we’re both about ready to be through with this project. We found some nice sized simple mirrors for $80 each, so we bought two to mount side by side. When I saw how excited Nik was at this purchase, I felt bad that I haven’t been giving him more breaks like this! We also got the sink backsplash affixed to the wall, and I sealed the doors with polycrylic. To fully wrap up the sink area, we need to mount the mirrors, caulk around the backsplash, install the doors and attach the pulls, and line the cabinets with new liners, most of which are easy jobs that we can get done this weekend:


Later on Sunday, Nik got to work on some of his lesson planning for teaching, and I got to work mixing up a small batch of mortar to patch the shower seams. This involved smearing mortar on the seam, embedding a a 2″ strip of alkali resistant tape, and smoothing it over. I can’t remember if I mentioned our shower niche, but it’s that black thing:


Close-up of the tape:



Now that this is done and dry, the next step will be waterproofing everything by rolling on 1-2 coats of red guard membrane, which we may begin to tackle tonight. The next step is mortar and tile, which I can’t wait for!