Monthly Archives: September 2017

The Tile is Up!

We didn’t get to grouting last weekend, but we DID get all of the tile on the wall! Tiling around the nook was not fun, and didn’t come out perfect, but I’m hopeful that the grout will patch in all the cracks and it will look great when it’s done!

Last weekend we got the tiles on the back of the nook done irst, so we could get a decent measurement on the depth of the side tiles. This weekend we first did the tiles lining the walls of the nook, which went alright. We laid them out first to make sure our measurements worked:

IMG_4003

It was tricky, because I didn’t account for the fact that all the walls of the nook are slanted to allow water to flow out instead of collect inside, so the corners all have a pretty tight fit towards the back of the nook, but quite a wide gap at the front of the nook. But I think with the grout in, this will look normal.

IMG_4005

IMG_4021

IMG_4022

On Sunday, we then cut the tiles for the wall around the nook, got our last row of mosaic tiles down, and finished with the bullnose on the edges of the tile. The 45 degree mitered corners of the bullnose tiles for each corner of the side walls just about had me in tears. Something just wasn’t measuring right, and we ended up wasting a few of these expensive tiles, and I had to drive back to Lowe’s to buy 3 more. But it’s done, and we’re so relieved. I even vacuumed up and neatened around the pan, so you can actually see our floor!

IMG_4025

IMG_4026

Next weekend will be grout grout grout, and hopefully tackling smoothing over the seam between tile, cement board, and drywall so we can paint around the shower. AND Sunday is our one year anniversary! Hard to believe it’s been a year already, but I guess that’s a good thing. We have an exciting event planned for Saturday, so we’ll update with some pictures next week if it goes well =)

I’ll leave you with a picture of our huge resident praying mantis. We see it every few days, and this thing is a beast. Shortly after I took this picture, it caught a large bumble bee and munched (crunched? There was lots of crunching…) it ALIVE right in front of us. At one point he dropped the injured bee onto the ground, and eerily walked all the way off the plant to the ground to retrieve the poor bee so he could finish his feast. Usually Nik is politely tolerant of  my often excessive interest in nature and bugs, and will briefly come look at the weird things I find. But for this show he was even engrossed!

IMG_4008

 

Progress Here and There

This weekend Nik got 3 applications sent away, so we had some time to get more work done on the shower. The tile is almost done (being placed, that is. Grouting hasn’t begun yet)! The last step of tile-laying is around the niche, and it will be complicated – having these tiles meet at right angles is tricky, because it’s not just tile measurements as it’s been everywhere else. Around the niche, we also have to account for the thickness of mortar and tile on the tiles in the niche and around the niche to ensure they meet at the right place. Cutting as we go might be necessary for this section.

Here is our progress after this weekend:

IMG_3994

It was hard to get the whole shower in one picture…sorry for the bad angle. I also did just the inside of the niche, with the accent tiles, so we at least would know the thickness to build off of for the sides, top and bottom:

IMG_3992

We got a couple other projects underway or completed this weekend which felt good. We bought an old window frame upwards of 2.5 years ago from an old warehouse in Durham, with plans to make a collage picture frame. We first reglazed the panes (this actually happened so long ago, it was before we bought out house!). Then, trying to figure out how to attach the prints to the inside of the glass derailed this project for about 2 years – we thought of using little black picture corner attachers, but the adhesive side that would show against the glass wasn’t pretty. Then we tried directly gluing pictures, but the glue made marks on the photos.

We had about given up, so we looked up videos of how other people successfully mounted pictures into these DIY window frames. This lady with a thick southern drawl came on, and said ‘it’s so quick and easy you wouldn’t believe it’ (hah, we thought, there’s NO way, we’ve been thinking about this for years and everything we try looks ugly and noticeable). She instructed us to use invisible tape – yup, plain tape, and just tape the corners. We were unimpressed, and knew we would see the tape and it would look so amateur. But in our desperation to get this project done, I tried it.

And guess what? YOU COULDN’T SEE THE TAPE! So, 2.5 years later, and we finally finished this project, using pictures from before our wedding, our honeymoon, and our trip to Utah. Now we just need to find a place to hang it!

IMG_3996

IMG_3997

I know this picture is blurry…but you can’t see the tape!!

There was one more project we did this weekend building a piece of furniture from scratch as a surprise for Nik’s best man’s new baby. I’ll wait a couple weeks until after we’ve given it to him to post that, in case they stumble on the blog in the meantime. I just wanted to mention it, you know, in case you thought we weren’t very productive this weekend!

I’m really hoping to get the rest of the tile in Saturday, so we can at least think about grouting on Sunday. After that, we need to patch all the drywall around the tile and finish painting the walls, caulk around the shower pan and finish installing the drain, and then finally install the doors and faucet hardware. I swear, this list seems to never get shorter…

Shower Tile, Phase I

Well, tiling didn’t go as fast as planned (it never does!), and Nik really had a ton of work work to do this weekend, between submitting edits for a publication he’s in the middle of, applying for jobs (which apparently require 16,453 different documents that I’m sure no one on these hiring committees actually wants to read ), and making lesson plans for the new upper level microbial ecology course he’s teaching. I’m trying to help where I can so he doesn’t have a nervous breakdown – but almost 10 years out from college, I just don’t have the motivation and work ethic that Nik still does to do that much work work outside of 8-5 M-F! He’s really committed to getting these things done and done well, which is awesome for him and it makes me proud to have such a driven and hard working husband. But unfortunately, the timing of all this work is bad news for our shower progress!

This is not to say that we didn’t get anything done on the long holiday weekend, but my lofty goals of finishing all the tiling and even getting the grout done certainly were not reached. While Nik was getting some writing done on Saturday morning, I started visualizing how the tile layout should be. We had a few obstacles to work around such as the niche, the faucet hole, and considerations such as the width and height of each wall. From past tiling projects, we’ve learned that it rarely works out to start blindly and hope for the best. When this is done, you’ll undoubtedly end up with a space that needs a 1/4″ more tile to cover it, or a tile that needs a circle cut right out of the middle of it for a spigot. Basically, Murphy’s Law applies if you choose to wing it.

So I decided I’d made some to-scale drawings of the shower walls, with all the trouble spots drawn exactly in place:

img_3973.jpg

Then I cut out little practice tiles (also to scale) and essentially tiled the drawings:

img_3974.jpg

One issue was the height was 76″, and our tiles are 12″ tall, plus the 2.75″ bullnose at the top, and 4″ of decorative tile somewhere in the middle. Not an even 76″. To make it add up, we ended up deciding that the very bottom row of tile would be cut 3″ lengthwise to make it only 9″ tall. Using my practice tiles was actually very useful, and guided a number of decisions about which rows would have the staggered start, where cuts would be around the faucet, and how we could do the niche with as little headache as possible. Once decisions were made, I started drawing cut lines on all the tiles for the back wall. Nik took a break to cut all these tiles, and that was Saturday.

Sunday we got some of our new fancy mortar mixed up (it has a higher latex content, so is more flexible and supposedly has the best grip for heavier tiles) and started laying tile.

IMG_3952

IMG_3954

We got about 80% of the back wall laid, up to the decorative strip, then we ran out of mortar and decided to stop there. On Monday, I got all the tile cuts for the right wall traced out and Nik cut them and then we started laying this wall. The mortar didn’t behave quite as well this day, and we had to add more water a few times to keep it pliable.

IMG_3958

I think we were also moving slower because not only were we having to think about the levelness of the tiles on this wall, but we also now had to ensure they were lining up with the already-laid back wall. This wall also had some major concave curvature going on with the cement boards for some reason (I’m thinking it has something to do with the questionable stud work in our house’s framing), which made some of the tiles appear to be dramatically different thicknesses. We did our best to minimize the problem areas, but there’s certainly going to be some weird grout lines on this wall. It is what it is!

IMG_3960

IMG_3961

We’re going to keep slowly working on the tile over the next few weeks. I decided rushing isn’t worth it, and the other things Nik is working on are much more important than getting our bathroom back a few weeks earlier. It’ll happen when it happens.

I also got around to lining the drawers of our vanity the other night, so we’re about ready to start using it again. It’s going to be weird walking in the other direction to use the  bathroom again after walking down the hall to the guest bathroom for so many months!

IMG_3964.JPG